Tuesday, December 25, 2007
Merry Christmas!
Thursday, December 13, 2007
Auction...
Cheers and Happy Holidays!
Saturday, December 1, 2007
Concrete gone, for now...
Well, here is a picture of the actual garden cart, lawn roller and last bit of concrete from the shed foundation overflow. We didn't have time to level the ground since it was getting a little dark by the time we were done. Hopefully I can get that space leveled out soon enough. I'm ready to get away from that project and move to getting other areas cleaned up. Just to the left of this picture is an area that I want to spend some time getting leveled out and putting in some grass seeds.
Speaking of grass seeds, mine are working! There are small blades of grass coming up. There are plenty of the rye that still needs to grow. Strange enough, it seems like there is rye in many parts of the property that is growing.
Friday, November 23, 2007
My Little Cart...
Well, it's about 2 foot by 4 foot. It's big enough to carry stuff. Mine didn't come with garden soil and plants and pots. It did however come with grass seeds and Christmas lights. Since I don't see myself owning a tractor anytime soon...and I need to get work done, the cart is now a reality. I went to the beloved Lowe's, who is always happy to take my money, and purchased this cart. It's supposed to hold up to 1,200 pounds, so it should be plenty sturdy. It was used so much today, we may have abused it! Next time, I'm supposed to give someone a ride in it. I'm starting at $5 a ride. You go as far as I can take you.
A bunch of little steps...
Oh, this is the 100th post to this blog. If you could see me, then you would know I'm doing the 100th post dance. (cheesy, but a milestone in endless blah, blah)
This is only after we spread out the dirt behind the shed, which was higher than the foundation and against the metal wall. I don't understand why the shed installers didn't at least move the dirt a little bit away from the shed. Oh well. That took some work spreading it out and hopefully creating a means for run off, that would go directly to the shed, to go to the back left side of the shed. We "contoured" the land, if that is what you would call it. We also did a massive attack against the left over concrete. We broke up some big pieces and took them in our handy cart (to be seen later) to my brother's property (with permission) to put in an area to help prevent erosion. We did this twice, oh my...a weeks worth of working out for sure! Then, on the round trip back, we picked up pieces of cut up wood on my road. We threw them into the fire pit. Someday, we will have a good start to a big campfire.
After almost three hours of work, we decided it was time to put up the shovel and rake. My next trip will be to help clean up the front of the shed and level it all out. Also, get the huge concrete blob out of the way. Heck, why not leave it and spray paint it. I'll call it concrete art! Nah, my brother could use it more. I'm sure that will happen in the next couple of weeks. I have to get used to all this manual labor.
Thanks for hanging out and hanging on...
Thursday, November 22, 2007
Viewing Loft...
I have loved the idea of a viewing loft for a good while now. Actually, it's sorta like a turret in a castle. You can climb the stairs and have a great view of the space around you. I also like the idea of it being a quiet space and a good reading space. Sometimes we all need to get away and have some privacy, for sanity sake.
I saw a book, Blueprint Affordable, in a local Half Priced Books and fell in love with one of the design elements. It had a viewing loft that was accessible from a floor with a bedroom and master bedroom. There is a website that shows it: Looney Ricks Kiss. It's the River House. The window seats in the master bedroom are awesome too!
Unfortunately the website doesn't have all the details or floor plan, but the book does. This book has a lot of other ideas that I have been wanting to incorporate into my house as well, worth looking at. Slowly I'm getting all my stuff together to take to a home designer/architect. Once I'm satisfied with my list of wants and needs...then, I can start the process. I believe it may be a while because I want to make sure I really, really like the ideas. I want to sit on the ideas and let them soak in, to make sure they are truly desired/needed. The plans just need to be reasonable and realistic, budget conscience and beautiful!
Happy Thanksgiving!
Wednesday, November 21, 2007
Waste Not...
Waste Not
Urinals provide a water-saving opportunity in the bathroom.
Source: REMODELING Magazine
Publication date: November 1, 2007
By Lauren Hunter
Many men are reclaiming their homes' dens, garages, and basements as “man caves” where testosterone rules. And what fixture is better suited to defining the man cave than the urinal?
Most plumbing manufacturers have urinals in their product lines, and a few note an emerging trend of such units being installed in homes. Companies including Kohler and Caroma offer urinals with sleeker, more compact styling than commercial units. And, manufacturers agree, water savings is an important benefit of having a urinal in the home.
“Residential use of urinals has been a trend in Australia for some time because there's a constant shortage of water in that country,” says Glenn Sheargold, owner of Sustainable Solutions International, the U.S. distributor of Australian brand Caroma. “Water use can be as low as 1/8 of a gallon, which can be considered a lot when it comes to a urinal.”
Eliminating water altogether, Kohler's Steward waterless urinal functions like usual but uses a vegetable-based sealing liquid, with a lower specific gravity than urine, to carry away waste. “Since its introduction, the waterless urinal has gotten more popular every month,” says product manager Shane Judd. “In addition to water savings, another benefit is ease of installation. Being waterless, you don't have to plumb a supply line for these models — all you need is a waste pipe.”
Sheargold says urinals can cost upward of $400, which may make homeowners balk when a $150 toilet serves the same purpose. But, he says, urinals pay for themselves. “With lower water costs helping you run a more efficient household, the return on investment is quite short.”
Judd says many women initially scoff at the idea of a urinal in their homes, but several attributes appeal to them in the end. “In addition to the water savings, women can stop worrying about cleaning up splashes, or having the toilet seat left up,” he says. “More builders are also seeing these benefits as a way to differentiate a custom home.”
Saturday, November 17, 2007
Stress Reduction and Manual Labor...
Also, today the wife and I went out to the property. I packed the car full of stuff, being a coffee table, a gardening tool organizer and a workbench. I unloaded and rested. That was right after my wife made the shed look and feel like a living room. We unloaded the rug and laid it out. Put the coffee table out and pulled up the recliners and glider/rocker. We had to sit back and enjoy the quiet and peacefulness of the country. All I could hear was the birds. I also then did some work by trying to smooth out some lumps of dirt and rocks that are around the foundation of the shed. When they dug up the dirt for the beams of concrete, they put it around the area. I was able to work on 2.5 sides of the shed. I just need to drag/smooth out the dirt in the back and the front. I need to carry off some of the piles of concrete laying around. I don't need the dirt up higher than the foundation. The back of the shed is my most concerned area, but the rain runoff goes to the side not the back. I'm trying to get it around 4" - 6" or so beneath the foundation where it meets the metal siding. I want to look into planting some grass seeds around the area soon to keep the run off from splashing dirt back onto the shed and also keep the dirt from eroding. I'm hoping that next week I can get close to finishing the rest. Today was a good day as it rained off and on during my work. It's starting to look more like civilized country!
Monday, November 12, 2007
Fire Pit...
I went back to the new subdivision and took some pictures of the firepit. It measures about 6' x 6' on the outside of the limestone. The inside is about 3' deep. The outside semi-covered bench/wall is about 10' on the side you can see and 14' on the wall that has the post closest to you in the picture. It's a nice outdoor space and has lots of room for people to sit down and enjoy the fire. No need for chairs.
As soon as I was done with the pictures and walking off the distances with my big feet, the sales agent came asking me if I wanted help. I just told her I really liked the design of the back patio and when I build my home I'd like to do something similar. She was fine with me snapping pictures of it.
To see my other pictures I took of the firepit, Click Here.
Oh, I had to purchase a flickr pro account to post this picture. After the two months of free flickr pro, it will not allow me to make individual folders to organize my photos on the website. I would have dump all of my pictures into existing folders only. Heck, I need this...one year membership. Next year I'll do another one. I also get 10 free moo cards. I think it's like business cards but it's about my flickr account?! I'll see. I'm gonna see if I can make it into a card referring to the Blog.
Tractor Day...
I learned a lot and will continue to look online and also at other sellers as I'm sure there are other deals. Only thing that made me wonder was the engines were painted all green, even the hoses. I heard once from a wise man, if they paint the engine...beware. They are making it look too pretty. I had that hesitant thought for a moment.
Overall...it was a good experience and I learned a lot, especially about Yanmar tractors.
Sunday, November 11, 2007
Flex Room Ideas...
Also, I went to see some houses and townhouses in a little neighborhood near where we live now. I liked the design elements of having a second bathroom, but having the shower/toilet area closed off from the sink area. Someone could use the sink while someone has more privacy taking a shower. Time efficiency in the bathroom. However, I would put in a pocket door from the toilet to sink area. It would make much more sense. To see the subdivision, click here. In all of "The Residences" you can see them. I saw a stone fire pit in the back of one model home. I plan to go back tomorrow and take some pictures for future reference. I'll post them soon. It also substitutes as a bench!
Storage Shed Move...
Now I have two recliners to set in at the property...and a bunch of stuff to look at. If there was enough water I could go fishing. Oh, I can take some things from the house to the shed...I've been waiting. I know I have a little table to take out there. Hey, to go with the recliners! Oh yeah, I need to clean the recliners some as I noticed some evidence of rats in the storage unit.
Have a good Veteran's Day!
Friday, November 9, 2007
Today...
Thursday, November 8, 2007
Shed Done...
Monday, November 5, 2007
Appreciation...
The emails that I receive give me ideas or tips based on what I post to the blog and are very helpful. Recently I was given an idea about a type of tractor that may do the job, Cushman. They are nifty little tractors. Do a search online and you can find them. It's an idea that I can look into. There is quite a Cushman following! Also, I was given the idea to look into getting mouse traps and insect repellent thingamajiggers to keep the unwanted little squatters from taking residence in the new place.
I really look forward to the feedback as that is how I learn and have better ideas. Remember, you are part of building this house, not just a spectator!
Roll Top Door...
I do like this type of door. The door also has a latch mechanism so I can put a lock on it. I'm very pleased with the overall product. Give me more time and I can tell you later if I'm still pleased with it!
We are 96% there...
As you can see...the project is mostly done! Actually, it's more 99% done. It's all installed and ready for me to move into it. I do need to sweep it out to start and then someday in the future I can work on making the area around it much more nice. The colors work for me and it feels like progress!
On the back right side there is a piece of trim that just doesn't set well with me. It's not straight and it looks like it was flattened and then screwed into the beveled side of a piece of metal. It doesn't look right and I'm concerned it could cause a water leak problem in the future. I'm surprised they did that. Maybe it was a "hurry up and let's get out of here" type of finish job. Maybe the person was hung over a little too much. Either way, I called the guy and told him my issue and he said he would go look at it. Heck, I still have his money...and he needs to get the shed completed the right way. They have panels of the roof laying to the side and could use them if they would work. Otherwise, I now have a bunch of metal panels to, umm...figure out what to do with them!
If you want to look at the rest of the completed shed pictures and/or the complete shed project pictures, then CLICK HERE.
Sunday, November 4, 2007
Here is an idea...
I found this at Home Depot online. You can fill it up with either 28 gallons of water or sand. It then acts as a device to smooth out the lawn. It's called a Poly Lawn Roller. It's $99 plus government funds. There is plenty of "sandy" stuff at the property, so I don't have to bring in gallons of water. The review I read said the guy didn't use a lawn mower or tractor to push/pull it around. He pulled it around himself. If you have been to the property, you can see that the dirt lumps are VERY lumpy. I don't know what would be more work...a rake or the lawn roller. The rake is cheaper, but the roller smooths it out more. Hmm...choices. See, research causes more choices. It seems to take up my spare time lately (meaning past 8 months or so). Between home designs, actual real time projects, planning projects and looking at lawn rollers, I stay busy.
Next Phase...
The shovel and rake are easier and the cheapest tools. I have done some research and decided I'll invest into an Echo CS-370. I have seen "brand new in box" on eBay for about $100 less than in a store, and that includes shipping. I haven't ordered it yet...but, it will be soon enough. I plan to start some projects by cleaning up some lower branches on trees and also trimming broken branches and cutting up trees and/or branches that have fallen. I will be stacking the firewood by the shed. The rest will be used in a campfire. Anyone ready for a long day by the fire?
I also plan on getting some type of riding lawnmower or tractor that can be used for mowing and attaching a dump cart to haul wood. I also need to be able to smooth out rough, lumpy dirt mounds. I want to plant a little grass in an area to prevent future erosion and have a "nice, clean" area that looks good. Giving me a vision of tomorrow. I prefer a rear engine mower and even looked at a used snapper today. I know I'm not the smallest person, but the mower seemed really, really small. I'm not expecting a lazy boy recliner on a mower, but at least something more comfortable. I want to go look at some at actual retailers to see what there is and see what I'm comfortable with the most. I can then look for used ones. I don't like the engine in the front as it's harder to see what you are mowing in front of you. It's not very fun to run over rocks, tree stumps or other various objects as they can mess up the mower when it could have been avoided. I have considered getting a smaller tractor. Yes, an actual tractor. It can have mower attachments and also possibly a blade attachment on the front, so I can push things around or even uproot small brush. I'll definitely let you know what I'm going to do as I'm not even sure yet. I have been spending a lot of time on Craigslist to check prices and what is available. I'll wait until I can pay cash for the items. I'm glad I research, but I'm easily frustrated as it drives me crazy. It's an OCD thing I'm sure! But, it has saved me a lot of money and possibly some frustration in not just buying the first thing I see, while benefiting by getting the best bang for the buck!
Shed Colors...
This is a closer look at some of the colors. They are warm earth tones and hopefully blend in the environment well.
Almost Done...
It's been a long four days. They say it would normally take a long day or one day and a short second day to complete the project. I went out yesterday, Saturday, to check the property and they were taking their time and spending more time chit chatting than working. Even the boss asked them what they did the past three hours. I'm happy I'm not paying them by the hour. They said they will complete it in the morning as they have to be at another job tomorrow. I also was told one of their guys was arrested for getting a DUI the night before and some others had a little too much fun last night to work today. They need to put in the back gable, the front metal panels and the roll top door. Then it will be ready for the "stuff" to be put inside.
Saturday, November 3, 2007
Shed Framing Done...
Thursday, November 1, 2007
False Alarm...
Wednesday, October 31, 2007
Shed, Shed, Shed...
Thursday, October 25, 2007
"Built Solid"...(An Article I Found Online)
Source: CUSTOM HOME MagazinePublication date: September 1, 2006
By Stephani L. Miller
Structural insulated panels (SIPs) have been around for more than half a century, but despite their many benefits, they hovered at the far edges of the building industry for decades. With the recent interest in green building and energy efficiency, though, they have gained popularity as a viable alternative to stick-built framing.
Consolidating framing, insulation, and sheathing into one installation step, SIPs are primarily constructed with two outer skins of OSB laminated to an insulating foam core of either expanded polystyrene or polyisocyanurate. A study by Oak Ridge National Labs has shown that SIPs provide a more energy-efficient and airtight structure than stick framing because they create a wall with continuous R-value; wall studs create a thermal break, counteracting the effects of batt and even foam insulation.
“SIPs are typically 40 to 60 percent more energy efficient than stick construction,” says Damian Pataluna, president of FischerSIPS LLC, adding that tested structural strength, efficient use of natural resources, warranties, and reduced cost of labor add to their appeal.
The panels are factory-built, some supplied as blanks with no cut-outs, others with window and door openings designed into the panel and with electrical chases routed, reducing waste on the jobsite. Most manufacturers offer ready-to-assemble systems that require no on-site cutting.
Once blueprints or drawings are submitted, the manufacturer analyzes the plans to determine optimal layout of the panels for each building, places window and door cut-outs, and identifies electrical chases.
Panels can be shipped sorted in the sequence in which they will be installed, but sometimes it is more cost effective to ship them in random sequence and sort them on the jobsite. Each panel is identified, and drawings and instructions for assembly are provided. Depending on the complexity of the building design, a SIP home can usually be framed in days, instead of the weeks stick-framing requires. However, interior walls still must be stick-built.
Although the panels come in standard sizes they are built to fit each individual home plan, and custom design capabilities are extensive. “If you've got the right builder and the right SIP manufacturer, just about anything can be done,” says Neal Wilkinson, structural product manager for WA Brown, maker of the SIPTEX system. Some SIP manufacturers can create features such as curved walls and roof turret treatments.
However, when it comes to complex roof designs, SIPs can be limiting. “The more intricate the roof lines and wall elevations—the more extravagant with lines and angles and cuts that have to be made—the less efficient the use of SIPs becomes,” says Tim Evans, vice president of sales and marketing for Agriboard. Roof panels also have span limitations, according to Doug Anderson, sales manager for Winterpanel.
Planning appropriately is the key to successfully building with SIPs. Builders and owners must understand that making on-site plan changes to a SIP-built house is more difficult and takes more time than making changes to a stick-framed house; it can be done, manufacturers say, but not as easily.
Awareness of lead times is also important. “When you start thinking about using SIPs, you want to get in contact with the manufacturer to find out what their lead times are so you're not caught by surprise,” Pataluna advises. “I tell my customers they need to have their SIPs ordered by the time they start breaking ground.”
Web sites:
Agriboard Industries
FischerSIPS
Insulspan
Partnership for Advancing Technology in Housing
Precision Panel
Premier Building Systems
Structural Insulated Panel Association
W.A. Brown
Winterpanel
Sunday, October 21, 2007
Blog Changes...
I have some catch up with old posts to get it to the new standard. Don't expect anything soon.
As you can tell, I took time to rest some today and spent a lot of time online doing more research and learning about some of the features of blogger. I like the ideas and hope the website is more user friendly and useful.
Click here if you want to look at the updates!
Great Kitchen...
I was looking through some home designs late last night and found this plan: The Plan Collection
The house is about 500 sq. ft. bigger than I really want, but is an awesome design. I loved the kitchen placement and the look. I was wanting an island that had the sink, dishwasher and stove all in one. This has it and it's an unique shape. I could see this working in the new house. I would change the home design, but keep the same concept flowing. I would put the walk in pantry and washer/dryer right behind the kitchen wall and push the hallway back a little for the back bedrooms. I would however take out the jack & jill bathroom. The little desk area is a cute idea though. To see all this, you will have to click on the link above.
Evergreen Front Rendering...
This is the picture of the front of the evergreen floor plan.
Evergreen Floor Plan
I saw this plan at: Evergreen Floor Plan
I like several aspects of this home. I would move the garage back and turn it into the casita. I would put a terrace/courtyard between them with some outdoor seating and fragrant flowers. I would attach the screen porch with another deck that would connect to the casita. Since I don't have an upstairs or basement, the stairs section of the floorplan are not necessary. That could be the computer and craft room. Back to the screened porch... I found that I really do like outdoor living spaces. I know the cats would love it. They would have the outside experience with noises, smells and visual stimulation with safety from predators and no chance of escaping and getting lost.
Prow'd House...
I do recommend their bed and breakfast to anyone. Check them out here!
In our discussion about the design elements of the house, the roof/ceiling was only 1 foot thick. All of the A/C ducts or vents were coming up from the slab. Oh, they had stained and scored concrete for their floors, beautiful! They didn't have to worry about the designing of the ducts in the ceiling or attic space, as they were in the concrete. I think that's a nifty idea. I don't know if it would be more or less costs than doing it the traditional way, but i know there wouldn't be issues with crimped A/C ducts, hot air coming out first in the summer and not having to worry about the A/C leaks that sometimes occur due to old silver tape coming off or racoons tearing up the duct work.
I liked the skylights in their house. Their house seemed to have a brightness and energy to it that gave it life. It was a great feeling! It was nice to know there is enough light during the day that none of the house lights needed to be turned on, as the whole house was bright enough. The kitchen was bright enough to actually cook a meal and not have one light turned on. It was like the outdoors were inside, but had some protection from the harsh rays and heat.
It was a good experience and gave me ideas and design delimmas to deal with in my head. I gave my name/address to the representative and he is going to mail me a copy of a Contemporary Craftsman home plan to look at. I still haven't decided how the house is going to be put together or which ideas, but I keep looking and fine tuning what I want, need and then dream about.
Rock Group...
Well, it's not quite about music. This is a small rock collection that I have from the property. There are so many colors, sizes and shapes. The rock on the right broke into half and fits together just like a puzzle, looking like one rock again with just a slight crack in it. Then the big one in the back looks interesting, but not sure what it is at all! Then, the one on the left, named as the "nipple rock" by a friend. That is the most interesting to me. Then there are the small ones in the center. I like the little white one as it actually has some red in the white. There are so many rocks on the property it's like a treasure hunt everytime I go out there. Many of the people have said it has a lot of flint on it and they have even seen parts of flint that would have been used by Native Indians. They property is such a fun place to spend time.
Wednesday, October 17, 2007
My Luggable Loo...
Yes, very soon i'll be the proud owner of this little Luggable Loo from Reliance. Amazon/Target will be happy to mail it to me. Imagine the UPS person asking, "what's in this big box?" I'll say, "My Loo". I'm sure it will just be waiting for me instead. Anyways, you may have been thinking I was crazy for getting a bucket and a toilet seat/lid...but, i'm not. Hey, it's cheaper than the almost $100 dollar models that require solutions, disinfectants, etc. Just get a kitchen trash bag, tie it up when done and put in the brute trash can. Done. Plus, it's luggable. ha ha. I liked the previous picture with the toilet paper on the handle, i'll do the same.
So, if you come out to the property and have to do number 2, or number one for women as well, look forward to using this contraption. It's better than what was there before. A prickly bush.
Happy loo'ing to you!
Getting the 2007 Living Dreams book…
I ordered a book with plans and brochures from Lindal.com. I can at least look at the plans and design elements. I heard it's a stunning brochure. I was trying to look up a promo code to get a discount or free shipping or such online since they had a place for a promo code when placing my order. Much to my dismay, I didn't find a code, but found something more disconcerting…
Click here for a Consumer Affairs link about Lindal Homes
I know they are only a few customers. I know that with every company, builder, etc. there will always be an issue with someone, no one is perfect. I will take into consideration it may be true and that it may not happen with everyone. Heck, I haven't even considered a house from them, but its good information anyways.
I look forward to seeing what they have. Also, in my search, I found a local bed and breakfast that had a house built with their products. I'd like to contact them tomorrow to see what they thought and also setup a time to go see it. Either way, it would be a beautiful drive out to Wimberley. Maybe I can get some friends from out there to go look at it with me! He and his wife are building their own home. I'm sure they may be interested in some of the architecture/design.
Tuesday, October 16, 2007
Shed Progress…
I talked with the AMC Building guy this afternoon and he said the storage shed would be built by the first week in November. He said they are building some large structures and may be able to squeeze this project in between them. He said it should take a good day, possibly extending into half of the next. Being today is the 16th, we are about 3 weeks from seeing a full storage shed. I'm excited!
I also asked for a color card/brochure of the available colors for the shed/metal. I would like them for color matching as someday the house could either compliment the colors or match the colors. Home Depot can match the colors if I brought them a sample of it. I know the two colors were clay and sandstone. It's very warm and neutral.
Contemporary Craftsman…
I found a website last night and was pleasantly surprised! I found a home design combination I like. I like the modern look and the craftsman, as I said in a previous post. The company was Lindal Cedar Homes.
Click here to look at the pictures of the designs.
I signed up to speak with a "representative" in Austin, but didn't hear from them today as I asked them to call. I'm considering buying the $20 idea/plan book. It has the floor plans and hopefully more information. At least I'll get some design ideas. I wasn't crazy about the idea of a cedar home, but the pictures are stunning.
I was able to register on the website and see many more pictures. I hope to see more later as I spend more time with it. This evening I plan on resting. There will always be tomorrow to look at it.
Monday, October 15, 2007
Talked to the cabin folks…
I called the place with the Shoo-Fly Cabin and learned a few helpful hints. As far as their company, they can make hybrid plans and designs. They can use materials that are not log cabins, such as SIPS. They can also re-engineer their designs, as they have in house people to make that happen.
I learned that there are many, many corners on the house and he said it adds about 4-6K for each corner to the overall price. He said most homes have 4 corners, not 20 or so. Complexity adds $$$. Different elevation roof heights adds price. Since he said the company can build hybrid designs, SIPS was an option. I was told that SIPS adds about 20-25% more cost than standard custom homes, but also adds a high level of efficiency. We discussed that and broke down the overall costs. He said it would actually cost about 10-15% more than standard custom homes. He said that since the amount of labor is decreased (since it's like putting a jigsaw puzzle together) and the fact that it already has insulation in it, the price is lower for those items. He said that most people compare stick framing to SIPS and call it similar, whereas they forget the cost of insulation and the insulated siding that has to be installed on it as well. That was helpful information.
As much as I really like the plan, I think that if I can add my already existing ideas to the new ideas here, it can be really neat. I liked the porch designs and I liked the inset outdoor living space tremendously. The fireplace outside is a really neat idea. I was originally thinking of a fire pit, but this is an alternative. I know it's more expensive than a fire pit. Maybe I can incorporate a covered outside living room space and have a fire pit nearby. We will see.
Sunday, October 14, 2007
Shoo-Fly Cabin Elevation
This is the Shoo-Fly Cabin's elevation picture. It is obviously a log cabin. I would change the look, definately. It would be more of a modern/comtemporary design. If you look at the http://www.agaveaustin.com/ website you will see the look that I'm going for. Otherwise, I'd go for a craftsman style look. I have always liked that look so it may be a toss up!
Shoo-Fly Cabin
I was looking at a Log Home Living magazine that has many home designs, of course for log cabins. I'm definately not into the log cabin look, feel or texture. My grandparents had a log cabin home and it seemed to require a lot of TLC to keep bugs and such from damaging the wood. That isn't the important part. I like this floor plan. I like the idea of having a fireplace outside in an outside living space. The design is nice and simple. I would like to have a larger dining space, but then again, it may be decent enough. I would screen in the outdoor living room and the master porch. The cats can go outside, but stay safe. I don't think they would leave the space.
The upstairs would need more of a redo. I would make some additions. I would change the bedroom to an open loft and maybe extend it some. Then, the space over the master porch and master bedroom would be converted into the two bedrooms. This would make the house change from around a 1300 sq. ft. design to a 1800 sq. ft. design.
I've had to rethink things a lot and think that I will need to build a casita, like originally planned. I talked to an architect recently and found it it is sometimes called a guest house or a granny house.
(Click on the picture to see the entire picture, at least for those looking at the blog website)
Restroom Facilities
I remember back when, and some of you may too, there was a fireworks stand and no toilet. The toilet looked something like this toilet! Well, it didn't have a fitting toilet seat/lid. It also didn't have this fancy toilet paper holder. For about $15 I can get this from Amazon. Well, just the seat/lid. I would have to get my own 5 gallon bucket, liners and toilet paper. Not too bad, since it gets the job done. Also, I would need to find a little tool pouch to hold the hand sanitizer. They sell accessories for 5 gallon buckets to hold tools. I just don't know how many things needs to be used as accessories for a toilet. I could put a reader's digest in it and possibly a little radio to listen to the sporting events. Hmm...lots of possibilities. Heck, nobody may want to get off the pot. I put this on here as it's an idea, very possible, but also sorta funny.
Saturday, October 13, 2007
Concrete Slab...no forms.
It's a glorious site! I have something there! Again, the feeling of progress has overwhelmed me. The forms and lumber are removed and leaves me with the duty to clean up some. There were plenty of nails on the slab that were picked up by the trusty extendable arm and will need a good dusting. Someday i'll take out a broom to clean it up some. I may wait a couple of weeks to wait for it to cool off some. I do need to go buy a good metal rake to spread out the dirt some and make it more presentable. There are a lot of extra remnants of concrete laying about and I will need to move those out of the way.
I talked to the Metal Building guy this past Thursday and he said he would check with the installation guys to see when they would be available to install the shed. I hope to hear back by the beginning or middle of next week with an estimate. I'm praying it will be done really soon. My next month's rent is due on Nov. 1st. As my back has been hurting immensly over the past week, I doubt i'll be able to act like superman and move things...or very fast. I know I will be needing some help.
Brute Strength Trash Can
I needed to buy this trash container. It's a heavy duty trash can and can hold 44 gallons of undersirable mess. Construction sites tend to become quite messy, as I have noticed. I decided to help any other contractors, or myself, have a place to store trash. I'm tired of having to ask them to pick up trash before they leave and they act like it was picked up already. Today I went out there and took the trusty extendable arm to pick up any wayward trash not picked up from the concrete crews. It wasn't much, as they came and picked up the majority of it as they cleared out the forms and extra lumber. I did find some "extra" toilet paper. I carefully picked it up. I will not tell you if it was used or not. You take a guess. My next purchase may be a portable toilet. I heard Academy has them in the camping area. It may not be a bad idea as I plan to spend long days out there myself. Hmm...too much information I suppose. Well, I have a trash can! Yea!
(I was told that legally I was required to provide restroom facilities aka porta-potty to any laborers if they were to spend over ? amount of time doing work at a property)
Wednesday, October 10, 2007
Finally...the concrete
I like progress! As you can see...the slab is poured! I asked them to put in a ramp too...as that will help tremendously. Also, it looks good. They will take off the forms tomorrow (and pick up some trash left behind). Now, on to get the installers ready for the storage shed. They will need at least 2 days for the slab to start the curing process. However, I have no idea how long it will take for them to show up and install the shed. That will be the next phase.
Monday, October 8, 2007
Birds and Bats…
I've been thinking a lot about what little buggers exist at the property. I know this past year has yielded much rain and has consequently created a safe haven for many little mosquitoes to thrive. Also, up near the front of the property is a big pond. I have been thinking of putting up a purple martin house that would allow bugs to be eaten during the day. Then, also put up a bat house to have the little Nile virus carriers to be consumed during the sleeping hours, at least human sleeping hours.
I'm sure the purple martin houses are standard. Clean them after they migrate…and wait for the new batch the next year to start new again. I have looked at several online and they seem to fit the requirements. I'm also looking at possibly buying one through a classified ad listing, possibly craigslist. I'm going to have to do some driving to find one I'm sure.
I saw a bat house that would hold 300 - 600 bats. I know that sounds like a lot, but according to the website it will serve a good 5-20 acre area. I'm all for little bugs to go bye bye. I read that it would be good to have at least an 80% capacity reached. I also heard that within six months to hopefully expect the first neighbor. It says on the website to move it around if a bat doesn't decide to roost within that time period. Enough with all the little details, I just think it would be neat to have a (almost) insect free space to live. I hope the actual neighbors wouldn't be shocked to see bats flying around at night, but I'm sure they will appreciate the effect. Here is the website for the bat house that I'm looking at purchasing someday: http://batroost.com/index.asp?PageAction=VIEWPROD&ProdID=11
Let's just say, I'd like to do it within the next six months or so for when spring rolls around. Also, get the birds and bats used to living there so when the house is there, they are already eating bugs! I have been out there many times and have thought I needed a big can of OFF to even stay outside the vehicle. Hopefully this helps it become an issue of the past!
AIA Austin Homes Tour...
I missed the AIA Homes Tour of Austin this past weekend. Home Owners were willing to let the masses show up and look at what some well known architects in Austin have created for them. I also know of someone that has gone to them on a yearly basis and loves going. I was able to hear about the homes and also what they liked and didn't like. These homes have a modern flair to them. They remind me of the Mid-Century Modern homes built around the 1950s, but with a today modern feel. A lot of the homes and styles are represented through a community in Austin, Agave. I was able to look at several of them and really enjoy the clean, simple lines. They seem easily enough to build as they are box shaped. There are so many different configurations of them. I like the idea that not much space is wasted. They are opened up to a lot of light as the homes proudly incorporate many windows. To see the website look up: http://www.aiaaustin.org/
Some of the homes that stood out to me were…
http://www.urbanjobe.com/postoak/resid_postoak.htm
http://www.aiaaustin.org/displaycommon.cfm?an=1&subarticlenbr=80
http://www.cuppettarchitects.com/trees.htm#
Hopefully I set aside some time and make sure to go looking at houses next year. I'm looking to become inspired.
Sunday, October 7, 2007
Paper or Plastic?
They have done a little more. I thought they did the rebar, but they actually cut out the footings/beams. It looks different than last time, which means there is some progress. I'm looking forward to seeing the next step. I assume the next step I will see is the concrete. I'm just going to wait to hear from them, they seem like they are doing fine.
Wednesday, October 3, 2007
Angle from the forms...
This is a picture of the new open area taken from the forms. This looks toward the driveway opening to the center left side of the picture. Also, almost between the two left trees, you can see my bathtub. I don't plan on using it...but, it's there. I will thank the previous owners. My brother said I should put some goldfish in it...I think not.
Makeshift Fire Pit
Well, this is my little firepit. As you can see, I have a very big, old cedar log to sit on as I will someday burn marshmallows, hot dogs, etc. You can see the brush pile nearby. It is much larger than it looks as the pile is more to the right of the picture. It will take a while.
I figure that I can have a little fire every once and a while. By the time I start, I will have the storage shed built, a little chainsaw and a little breathing room. I will not be so rushed to get the next project done, so I can enjoy having a fire.
To the left...
This is to the left of the drive up into the open area. You can't see it, but to the far left tree line, that is where it starts to decline quickly to the bottom of the creek. Since we had extra time to use up with the bobcat work, I figured I'd have this done. I wanted a view toward the creek. I will have some "finish" work to do...someday. If you look far back into the picture, there are the forms again!
To the right...
this is the newly cleared off area to the right of the drive up to the opening. There are trees. There is still a lot of privacy, but now the space looks huge! If you look far back, you can see the gate between the properties.
Forms are completed...
Here are the forms for the storage shed. They were in and out. For some reason, I imagined them actually doing all the work today, but no, that will not happen. I called the guy and he said the next step is to have someone go out there and put in the rebar and dig for the beams. Then, the last crew comes to pour/finish the concrete slab.
I glad this much progress has been made. Looks like something is happening!
Monday, October 1, 2007
I’m ready for the next step…
I made my calls and let the concrete people know about the site leveling being completed. I talked to him today and discussed the specifics of what is to happen next. He said they will put me on their schedule for tomorrow. He will know if it's first or second on the schedule at 5:30AM. He said he would call and leave me a voice mail. Either early tomorrow or possibly late tomorrow, I plan to meet him to get a good handle on what they are doing and how.
I'm grateful to have good co-workers that understand that my project needs to have hands on attention sometimes. As soon as I know, I will let my fellow co-workers (warriors of patience) know what is happening.
I'm excited to know there is so much progress in so little time. I called the metal building guy and he said to let him know when the concrete slab is poured…and done. He said that it can be 4-6 weeks out for installation. He said that about 2 weeks ago. I asked him about having the concrete ready and it just sitting there. He said there are places that may have orders in before me, but no concrete poured. He said I would be bumped up on the list as mine is ready to go. (He said he was surprised that my project is getting underway so fast, at least the concrete pouring, as he has customers that have been waiting since February to have concrete done and it isn't!) I will not know where I am on the list until I tell him it's ready and he contacts his installers. I plan to make that call tomorrow afternoon when I go back to the property after work. I can only pray they come out in the next couple of weeks. My project is at the last leg of its race, at least in time perspective. I can only hope I don't have to pay for one additional month's rent. It could give me some nice breathing room, but I don't want to pay them anymore.
I also plan to take some pictures tomorrow when I go out to the property. I'll post them hopefully tomorrow evening!
Site Leveling done…
Wow! What a difference 7 hours can do! First, we (bro and I) arrived at 10AM, estimated time of arrival of our hired hand. He called and said he would be up to 2 hours late due to a flat tire. Heck, we just hung around, talked, kicked some rocks, etc. Then, the guy showed up.
Our first business was to get the site areas leveled for my 20x20 ft. slab and my brother's 12x16 ft. slab. Then, also to clear my bro's open area of all the little, now up to 7' trees, out of the space before they become too big. So, we drifted away and drove to LaGrange to find some little bakery and get some kolaches. We stopped by a store closing sale, being furniture. Nice stuff, still big prices, not the right time to buy anything. We kept going some and since I was hungry we stopped by Jalisco's Mexican restaurant! That's some good eating. Before then, we stopped one or two businesses down and saw some little, little Daihatsu trucks and also looked at a close ended carport. Only $795. Maybe it could be a good price, if they could have the same siding. Or just see if the other company makes the same type of product.
Back to the property…all in about 3 hours he did all the site leveling and clearing of trees. We found out a few things. The ground isn't full of clay like we thought, but sandy loam. The front of the property is the clay stuff, the back is very soft. I was also told that because of gas prices, he couldn't charge us the way low rates, but would charge us $15 more per hour to come out next time. That helped make a few decisions. I had enough for 7 hours of work, wanted future work done anyways, and we have him for four more hours at the original rate. Hmm…what to have him do?
He then cleared out the road area for my bro, smoothed out piles of crushed concrete (from the original owner's house having the foundation repaired and the contractors dumping the old concrete on the backside of her property, without her knowing) and made a small path by clearing out brush from a water spicket to the area the slab is intended to be put on his side. He wants to have a water pipe run from the water line over to his future pavilion/BBQ pit area. I assume he wants a small sink of sorts.
Then, we still had some time. He then was asked to go back over to my side and clear out some brush near the top of the ridge that leads down to the creek. I wanted a nice view of what lies below and not hide some of the beauty. Before that project, I asked him to make a 2 ft. deep fire pit, or so I called it. It's about 6 ft. wide both directions. Being I was having a bunch of brush torn out of the earth, I need to do something with it! I plan on having a few nice fires over the next year or so. As early as this winter. There are plenty of old dead branches lying around that can be used to heat up some smores, hands and cold feet. Hot Dog roast anyone?
It started to rain. Only after he mentioned that we really needed a good downpour to settle the leveled areas more, since his bobcat can only do so much. Ha ha…did it rain or what? I was soaked by the end of the day. I asked him if he knew it was going to rain, he said no. That was really funny! It rained for about 2-3 good hours, off and on, heavy and light. He then still had some time left, so I asked him to start clearing out an area that I wanted done the first time, but didn't get done due to time, etc. He didn't get it all, but looking at the size of the brush pile made it ok. Like I said, I have a lot of fires to produce.
7 hours, $350 and a good soaking made for a wonderfully productive day!
Now, ready for the concrete!
Friday, September 28, 2007
Getting closer…
Well, this has been long overdue. We have some progress and here goes…
From my three people bidding on doing the property, one never called back (and that's ok with me) and the other two had high bids. The first wanted to charge minimum 22K for the storage shed/carport. Then, the second guy was taking a LONG time to get back to me. I decided…let's check out one of the metal building companies that are local. I also had to rethink my plan. It simplified. Just a storage shed will have to do.
I went to the AMC building people that are in Manor, Tx. They have a fabrication plant in Bastrop, so it's still local. I learned that I can get a 20x20 storage shed, slab and roll top door for about 7K. That is the size of a small two car garage. That will have plenty storage. It will have 5 more feet one way and 10 more feet the other way compared to the already existing storage unit I'm renting right now.
I finally called the second builder and he seemed to be looking to subcontract the project. He said not everyone called him back, but the first subcontractor quoted him 75K. He said it was unrealistic. No doubt! I cut to the chase and said, I have someone that can build a storage shed for about 7K, can you match or beat that? He said he probably couldn't. I told him that due to time constraints…I needed to move quickly! I may have him involved in my future…but, not right now!
I contacted the AMC company and decided to get one that has a height of 9 feet on the side walls, instead of 10 feet. They have a model that is 10 feet high…and it's a monster of a storage shed. I saved some money too by going down a foot, several hundred dollars in fact. I can handle that! I chose the side walls to be a "clay" color and the trim and roof to be a "sandstone" color. Yeah, I know that's hard to imagine. The colors didn't seem to match the description to me, so, you will just have to see it in a picture in the future. He said it can take 4-6 weeks to get completed. I have to get on the ball! I'm looking at only having about 4 weeks before I have to either renew my storage unit rental or get moved out!
I quickly contacted others…getting ready to get started. So, that brings us more up to date! The guy that is going to do the site leveling is coming out this Saturday to get the areas ready for the forms and pouring of concrete. I put in a call to a concrete/foundation company to pour the concrete. They are giving us a great price. I left a message with them to be ready for the next week, as they told me to just give them a call and they could practically do next day service. I need to check again with them today to make sure they have the foundation plat and also check to see if there schedule could allow for a first of next week pour. I'm excited…and nervous. I'm ready to see this done!
Sunday, September 9, 2007
First Bid Arrives…
I received a call on Saturday. I would have posted this then, but had to pick my brain off the floor first. As I finished the phone call with the quote, I said, "Ouch". Someone asked if I hurt myself, I said that I stubbed my brain on something, instead of, say, my toe. To get it started the quote for the carport and shed was 22K – 24K (depending on if I want soffit or not). My first thought was, this is a shell, a covering and a slab. I would think the slab could be one of the biggest costs. After my first 30 second estimate of around 2K, I was shocked. I still have yet to hear from the second guy.
It was mentioned to me the guy may be trying to bid high, so he wouldn't do the job. I'd figure I'll know when the second guy gives me his bid, as they are basically the same structure. In fact, the second guy put 2 extra feet into the slab.
I know I'm not trying to jump ship and jump to conclusions without the second bid, but if they are anywhere remotely close, I have to rethink my project. I have looked at places like homedepot.com and lowes.com for do it yourself kits, or already put together sheds. They don't go over about 7K. So, if I pay 7K plus a slab…even 10K sounds more reasonable. I wasn't prepared to pay that much either, but it's a better option. I'm thinking, just a shed is fine now, that is mainly what I need. I'll deal with a carport later so a smaller slab and just a storage shed are the only real necessity. Heck, I've thought about a dirt floor, but that is going too far.
I'm looking at more options now, as my head still spins, and have gone back to an original idea that I had moons ago! What about steel buildings? So, I'm looking at these websites for ideas…and possibly costs. I know they have kits, but the kits are still less expensive. I'd only have to either put some sweat equity into it…or have someone help put it together and pay them. This one, http://www.amcbldg.com/ , doesn't have a price list, but has the basics of what I need. Plus, they are a bunch of local people. My second thought belongs to these guys, http://www.muellerinc.com/ . They have a steel building prefab kit that is 24x24x10 for about $3600. That's a big storage shed…actually the size of a two car garage. I could do a lot with that. Add the cost of a slab…and a garage door. Hopefully be out of there with less than 10K invested.
I've already been imagining what I could do with an "extra" garage. I could put a small solar panel on it to give enough electricity to maybe a four plug panel. That way, the land can have some electricity for things, although not a huge amount. It can power what could be a nice TV and refrigerator for that "man cave". I could put a table and chairs in there…and just open the garage door when the guys come over. A cold drink, good football game or NASCAR race and sit back and have a good time. Heck, if I could eventually get wireless internet to stretch that far from the house, I could order papa john's pizza or dominos pizza from online. I'd be set!
Enough wishing…I have to consider my options. I'm looking forward to my second bid. I say that optimistically.
I hope your weekend was good!
Sunday, September 2, 2007
Second Bid…
I've known the second bidder, so it wasn't as much of a first time to meet. We talked briefly as to how we got the land and the cool features it has, in my opinion. He was able to get a rough idea of what we wanted and pretty much followed the same design format as the first bidder, without my prompting. However, he did suggest to put in skylights as an alternative to a light source than the transom windows the first guy suggested. I like the idea of skylights better as well, because it will be direct sun from above lighting up the space below. I would think the transom lights would only allow partial light to filter in, not giving it maximum light that may be necessary to complete the space. Also, with this guy, he added another 2 feet on the length of the slab/project. I'll have to remember that in the bid amount. I like having the 2 extra feet.
If I find I like the pricing for the first guy better, I'll ask him how much would it be affected if he took out the transom windows, put in skylights, and lengthened it by 2 feet. I'd like to see if the $ changes by much.
I'm also looking for a future builder…and these guys are both potential. I have seen the portfolio of the first guy, who said he would give references. I don't have any portfolio projects to look at of the second guy, other than to know about his work he has done for me in the past.
I hope to hear from them both by next week.
I don't think I'm going to hear from the third guy that I was asking for a bid from. And…I'm not going to try to either, it was too strange. He will work by the hour, sub contract it all out…and has no estimate in price other than, it will probably be cheaper than a hard estimate. That is too vague for me.
I hope you have a great Labor Day weekend!
Thursday, August 30, 2007
First Bid
This was a nice occasion. The guy was friendly and the wife liked him. He was very personable and willing to give out ideas. The carport/shed starts out with cedar/treated wood framing on a slab. Then, it is basic metal roofing and 4x8 sheets of hardiplank. It will have a terminal or space to put future wiring for electric. Then, it will be estimated with a 10" overhang door (garage door). He figured in a gabled roof, or one that has a mid ridge and then goes down both sides. Instead of corrugated see through roofing, he recommended windows like thin transom windows that go along the top of the walls, for privacy, but some light still. The size will be estimated at 33 feet long by 18 feet deep. Hopefully that will be plenty.
I also asked him to write up a bid for my brother to have a covered slab that is 12x16, which he eventually wants to put a BBQ pit on.
I hope to hear from him by next Wednesday with some $$$ figures that hopefully are closer to $.
I almost forgot to say, I talked to him about the house plans, as he is a house builder, and he was able to give me some financial advice. I told him that I was thinking about starting off the project in sections as I was able to get enough money to pay it off as I go. Then I would get a mortgage/loan to pay the rest off and get it done. I'll be chomping at the bit at that point, I'm sure! He said that some lenders do not like to be surprised at the fact they are supposed to fund a partially built "project" and have the liability of paying out the rest, not knowing the quality, etc. of the current structure. He said that sometimes they will do it, or recommend a personal loan for the remainder of the money. The other way he said it could work is having a lender involved from the start, but let them know the plans and if they want to inspect the work as it goes on. Then they may be more willing to give a mortgage for the remainder of the amount when that time comes. I'll have to take that all into consideration.
Our next bidder is scheduled for Saturday.
Wednesday, August 29, 2007
Funny Bid Story...
I reminded him that I didn't call him to reschedule. He said he was baffled and has never experienced this before. I laughed and told him he may need to find out who he (re)scheduled and let them know it's now my new schedule. He said it was no wonder the other person was confused when he talked about Wednesday.
Today he went to College/Bryan Station instead of on Thursday due to the schedule change. As much as it inconvenienced me and causes me to do a lot of driving on Thursday, due to having to drive across town for a dentist appointment and then right back across the same way from work to meet the guy, it is comical. Either way, the humor outweighed the frustration from being excited and ready. He still seemed stunned when getting off of the phone. How funny!
I'm glad to post something funny and couldn't really wait until tomorrow to let you know! I hope tomorrow brings a good report!
Sunday, August 26, 2007
Getting some bids…
I was able to call 3 people to see if I can get some estimates on building the 2 car carport and the attached storage shed. One guy will give me a call back with an estimate. He said he would work on an hourly basis, having me pay any subcontractors directly. He said it normally cost less than having a hard estimate. Hmm…I'd like to see his pseudo estimate. I asked him to think about what materials may cost and about how long it may take to be built, multiply that time a hourly wage amount and give me an estimate. Strange.
The other two guys are actually builders, vs. the handyman, and will come out to give me some bids. One is scheduled for next Wednesday afternoon and the last one is scheduled for next Saturday afternoon. One of the guys gave me an original estimate of about $2000. It was a 30 second estimate. I'd rather him think it out thoroughly. I'd hate for a $2000 estimate turn into a $4000 estimate. I do have a budget and a timeline.
I originally thought of having a cinderblock shed with metal/tin roof. Simple and sturdy. They are saying it may cost more. Ok, here are my thoughts. I do somewhat care what the materials are, but my bottom line is this… First, it must last a very, very long time and not rot, etc. Secondly, it must be cost effective. Sort of like the cheapest, best way to build it. I'm sure that is most people's ideas when the build.
I look forward to talking to the builders, as they could be potential builders for the house too! I like the idea of having a trial run with these guys. I want to see what it's like to work with each of them, personalities, work ethics and looking at their ideas.
Until then, happy Sunday!
Holy Mole, Look at all the metal pieces Batman!
Yes, my brother and I went out yesterday to see if we could remove a few pieces of metal from the road. I'm grateful a good friend let us borrow his metal detector. I thought when we first started, we would spend about an hour in the first 20 feet of the road pulling out metal pieces (being nails, rebar and other "Huh?" stuff). Much to my amazement, the pieces were less. At least I think so. The MD was going off non-stop. I had received a brief lesson on how to use it before departing to the property, I'm good. Since arriving, I had to call to confirm. This thing keeps beeping, and sounds like a mad video game or a very bad techno song. The lesson is over and I was doing things partially right. But, it still plays it's tune.
Most items are showing 8-10 inches deep. Now, the guy spread it out to only be about 3 – 4 inches deep. So, what was on the original road? Who Knows! We did find a lot of 4 inches or less items. Approximately 3-4 times as much as you saw on the last picture. I found something that looked like a lipstick container, but I think it used to be a tool. I'm not sure and I don't care to find out.
I am however, still concerned with driving on the road. We did excavate a LOT of stuff from it and that lowers the worry. But, the worry still exists. Last thing I want is a flat tire. We discussed putting down a top coat of road base, not crushed concrete sprinkled with metal pieces. Have another 2-3 inches of base that doesn't have anything, and it should put the remainder of the items at about 6-7 inches deep. I can handle that. It will cost another couple of hundred dollars, but having more road base was suggested originally anyways, not as much of a big deal.
Also, the guy spreading out the road base made several suggestions and also located a culvert that he can reuse in the place he said it needed one. He then said he would redesign the runoff paths, for water, so the road doesn't wash away. Sounds like a good idea!
We are getting along. I'll still park out by the gate for a little bit!
Friday, August 24, 2007
Ok, the only bad about green...
This is what happens when you go green. OK, maybe that's a bad way to think of it, but...
In the recycled concrete the rebar was left in it. Very Bad! I thought it would be sifted out when they crushed it and processed it. Can I hear "Flat Tire!".
I plan on seeing if I can borrow a metal detector and find more rebar to feel comfortable to drive on it. I'm still happy to have a road. Another lesson learned!
Toward the entrance...
This is back at the main gate, looking at the main road again. It looks much cleaner and a much stronger road.
Woohoo!!! New Road Base
Wow, for the price and for the look! I'm very happy with the job done and it looks great! Near the little pile of dirt on the left side of the picture marks the area that a culvert needs to go. There is an unused area toward the front of the driveway may actually be able to be dug up and placed in this area. If this works, he can go back and take it up, and then put it back into the road in this area. I'm going to have him try it. It's worth the money to spend, to save several hundred for a new culvert.
Thursday, August 23, 2007
Time Delay
He did recommend a culver to be installed, at 16 inches in diameter and about 22 feet long. He said it would be around $250, so I decided today was not the time, maybe in the future.
I'm looking forward to the future and building my shed and carport!
Tuesday, August 21, 2007
Noah, help???
I must enlist the help of Noah in this journey. Dean is messing things up. Yes, the hurricane, not some person named Dean. We were about to smooth out the road base tomorrow, but, low and behold, A Rain Storm sweeps through the area. Now, it's muddy again and not in any shape to be fixed up.
I will survive, life will go on. I just want to move to step 2 or 3 now. I was planning on getting some bids for the carport and shed either the end of this week or by the weekend. I may have to wait on those.
I am currently working on a picture of the third plan that I have in my mind. Now, the picture is so very not to scale. Just imagine the layout. I should send that out tomorrow evening. I'll try anyways.
Sunday, August 19, 2007
Master Bathroom Idea...
I was at a friends house a while back and talking about designing the home and also about a bathroom remodel they were thinking about. She said that I should look through her Woman's Day magazine for ideas. I saw several that I liked, but when I saw this one, I had to drool some. Long story short, she said we could keep the pages that are of this bathroom (yes, ripped out of the magazine).
I have yet to show you my latest design on the home, but this bathroom has a new place in my new design. I love how the shower and tub are separate, yet in the same space. There is a glass door in front of the shower side and a glass panel in front of the tub. I like the natural lighting. Now, my adaptation of this will be no way this elaborate or luxurious. I just like combining the two in one. This also allows for setting down, relaxing with a steam bath, etc.
Saturday, August 18, 2007
Rain, Rain, Go Away!
I was appreciating the dry weather because I can do work on the land. Today I would have been at the land watching someone spread out the road base and work on creating an improved driving experience through the first part of the land.
Hopefully it will dry up enough to let him work on it next week, possibly between tropical storms. Yes, another round of rain is expected sometime next week.
We have projects and I have deadlines. The rain is hindering them. I'm not trying to complain, because we can always use the rain!
My Second Design, part 2
Alright, this is my second part of the second design. I have changed the position of the Casita and walkways.
It still doesn't cover the space well enough for weather.
I have thought of a covered breezeway that acts like a long hallway, but is also the pantry, laundry space, cat litter box area, etc. Also, this would have access to a courtyard. It would be nice to have a trellised area in between the main house and the casita. Then, have Wisteria growing around it. Beautiful. Good ideas...