Saturday, November 21, 2009

Elevations...


These are the elevations sent to us by Ryan Builder. They all look fantastic! We have requested a few small changes and a few more are on the drawing board to discuss and decide. We plan to change up the siding from regular lapped hardiplank siding to board and batten. It is a different look and will go well with the style. I'm starting to get more excited about the finished product.



Above is the right side of the house.


Above is the left side of the house.


Above is the front of the house/casita.


Above is the back of the house.



Above is the right side of the casita.


Above is the left side of the casita.


Above is the back of the casita.


On another note, I contacted the electric company and they will be out in the next 2-4 weeks and get electricity out there. The soon to be crews will need it to work. I'd hate to have them build it with hand saws. :-)

Sunday, November 15, 2009

Two more renditions...and we have our winner!

We have our plans...they are about 99.98% complete! Unless there are small changes from this plan, this is it folks!!! We still have elevations to look at, hopefully the beginning of this next week. Then, it's off to CAD and then off to the bidding process to get the house built! I'm still considering different water sources. I'm almost certain we will use the local water. I understand it's really hard to hit a well the first time, yet it can happen. I'm leery about moving this direction. I will contact the electric company this next week to get on the books for getting electricity provided to the property. It may take up to 6-8 weeks to get the building process going. Maybe less, maybe more. I'm not sure. We will all see!

I noticed that I skipped a prior home plan...and last talked about having a two story house. It ended up adding about 300 sq. ft. to the plan just to have an upstairs. That is a lot of $$$. Going back to a one story and getting the sq. ft. right was the direction we decided we needed to go. We are very excited about the one story plan.

I'm excited about these house plans and hope you could imagine yourself coming to visit someday! And thanks to Ryan Builder, Inc. for getting us closer to our current dream home.


Thursday, October 15, 2009

Small Update...

but lots of progress! We spent 4 hours with the architectural designer last night. It was a lot of time, but well worth it! I think we will be getting much, much closer to what we want! I'm excited and looking forward to the next rendition of the house plans. Hopefully we will be looking at a very close version to the final version.

We did decide to go with a 2 story design. We hope it gives us views, saves money and helps with the carbon footprint. I know that stairs are sometimes a nightmare for some. I have experienced stairs that are horrible. They are too short and too steep! Those create negative experiences. If stairs are made correctly, then they are much easier to climb. That is our goal. So, someday we hope you try climbing our stairs and see what it is like.

Au Revoir

Wednesday, October 7, 2009

New Design Layouts...

OK folks...we are getting much closer.

We were sent two different designs today, one of which is a one story and the other being a two story. Just to see the differences.

I like the one story best. I'm still having issues with design layout. There are still some changes that need to be made with the design layout, but we are about 80 - 85% there. One of the major changes that need to happen is making sure the kitchen has a wall of windows. In both plans, it is not there. Oh, there isn't an island either! The other major issue is the layout of the Casita. We are wanting a different design layout and it isn't in these plans. All the other issues are probably easier to move/add/change to the layout. It is a process and it will all get worked out in the end. I'm still trying to stay budget conscience, but I've been asked, in my own words, to put off judgement of the cost factor. I'm really looking forward to seeing number round 3. We may be meeting with them next week. We will see.

Here is the one story design:



Here is the two story design:



Saturday, October 3, 2009

Concept Designs...

A couple of weeks ago we received 3 concept designs. I think that conceptually, they are very close. Realistically, they don't match the property very well. That was conveyed to the architectural designer. They went out to the property again this past Friday to re-check the property and make sure what space was available to place the house and work with a design within that space. I did recreate the concept 2 design, as I liked that one the best. This weekend I plan to try to come up with another design that could help them see what we want...I'll have to post that later. Here are the pictures...



This next one was my favorite. I loved the entry and how it separates the master bedroom area from the rest of the area. I also liked the courtyard and the ease of having a screened in porch on the other side of the entrance. I think this plan has more potential than the others.



This next picture is the third concept. This is the one I liked the least. Everything is too spread out. And...parking over the path seemed interesting. Now, I can see it in my head, but the space is too stretched out.



This is my revision of concept 2. I think it brings us much closer to what we want...



One of my biggest concerns is cost. I believe we can still get what we want, but keep it "cost cautious". A new term...:-) I know my revision has about 16 corners. I've read that each corner can add 4-6 thousand dollars to a houses price to build. As much as it's important to make a house visually appealing, it's important to keep it in budget. I've seen some ideas lately that help dress up corners that keep them appealing without having lots of inside/outside corners that make it interesting.

Happy Trails...

Thursday, September 24, 2009

My First Bubbles...

Ok, as far as our brains will take us to the moment...we made our first version of the bubble plans. Basically, the layout in concept. I look forward to seeing Ryan's ideas and see how close that is to ours. Here is the square version of the Main house first. The second version is of the casita. This is what we have so far. Who knows what will really happen!







Wednesday, September 23, 2009

The Sun and the Tour...

One thing that was mentioned by Ryan is to make the side facing the west to be the shorter side of the home. So, would a square have a shorter side than the long side of the rectangle? Guess the picture in my head has to change. I look forward to seeing what he has in his mind. I've been working on the Bubbles. Or...layout. I know he has, but at least I can give him what I have in my mind and see what happens. So, tonight I made a square bubble plan.

Also, the Austin AIA Homes Tour is October 10th and 11th. I have family plans scheduled for the 10th. I'll be touring on the 11th. Here is the link: http://www.aiahomestour.com/ I hope to get some ideas that can be incorporated, if feasible.

Au Revoir

Tuesday, September 22, 2009

The house is moving...

Well, only about 30 or feet away. This was the recommended place to move the house. The black box represents where it was originally intended. The white box represents where it will go instead. Also, they did the soil test with no problems. I still haven't received any results from it yet.

We are now working on helping with the conceptuals. Giving the spaces in the house definitions, the expectations and purposes/uses thereof. Then, we are also putting our "bubble" layout together and will work on that Wednesday night. It's a rough idea of where we may want things. I'm expecting the architect will help us if things need to be moved around or best placement and flow. Lookin' for a little Zen in the play pen.

Friday, September 18, 2009

Soil Testing...

I met with Tony, Ubuildit, and MLA Labs on Wednesday PM. I again was recommended to move the house back and to the left. I can see more now what the benefits would be. It is being backed up to the trees, blocking the west sun more. Cooling the house even more. Another benefit is having more space in front of the house. That gives more parking room, something I've been concerned about. I liked those ideas.

I then went to visit someone who is a reference for Tony. I saw their house and ended up visiting for about 3 hours (give or take). It was amazing to see a house at 6:30PM that is 3700 sq. ft. and was in it for about 2 hours, no AC on at all...and very comfortable! Wow! I learned a lot about the building process, my part and what to expect, good and bad. It was very beneficial.

The Soil Boring will end up happening tomorrow, Saturday. It is a quick turn around. I didn't expect it to be done so fast. We will get a soil analysis and a report as to what would be recommended with building the engineered slab. Gotta make it right or it could cost a LOT later.

I plan to also go to several places, appliances, plumbing, etc. tomorrow to get some ideas and pricing for fixtures, bathroom and kitchen spaces. It will give me a better idea when it comes to actually starting the next phase of building.

Cheers!

Saturday, September 12, 2009

Craft Area...

It was posed to us to think about square footage and how to make everything we want work. Do we just have one extra bedroom or two? How do we make space for our individual hobbies, interests, etc.? I think I have an idea for the craft area. I think it can be done in 30 sq. ft. Imagine a wall closet. Same idea, but somewhat bigger. It would be about 10 feet long and 3 feet deep. Countertops and lower cabinets are about 24 inches deep. That would give about 12 inches of open space between the bi-folding doors. Also, there is the storage cabinet we already have. We can have an open space for seating to be stored under the countertop. The upper part will be open shelving and the lower part is cabinets made of drawers. If possible, we can put a window between the lower shelf and the countertop. I have seen that in some of the newer kitchens. That would light up the workspace during the day. I think this would cut down from the 8x8 small space or the 10x10 room space, saving 34 to 70 sq. ft. we don't really need to waste. Also, her chair and work space would open up to the living room so it's one big space. Once the doors are closed, it will not exist and will look neat and tidy again. I think it's a great solution. Here is a top view image I tried to put together in MS Paint.